Page 144 - The Six Sigma Project Planner
P. 144

Item             Findings       Responsibility   Due Date     Issue #
                       Is the information
                       easily available to
                       those who need it?



                       Is the process
                       operated differently
                       at different times of
                       the week, month, or
                       year?
                       Are there simple
                       things that can be
                       done right away to
                       improve this
                       process? (e.g., lean
                       manufacturing,
                       main-tenancy,
                       rearranging the
                       workplace)
                       Can poka-yoke
                       (foolproofing) be
                       applied to eliminate
                       the effects of
                       human errors
                       without additional
                       inspection?
                       Would a simple
                       procedure or policy
                       change lead to
                       dramatic
                       improvement?




















                                                             127
   139   140   141   142   143   144   145   146   147   148   149