Page 243 - The Six Sigma Project Planner
P. 243

Note that this is considerably better than the 0.979 RTY calculated above. Since the
                    individual process steps have much different dpu’s, the earlier estimate should be used.


                                      Worksheet 70. Rolled Throughput Yields Worksheet

                       RTY Capability

                       RTY Actual

                       Project RTY Goal

                       Things to consider:
                             How large are the gaps among the actual RTY, the capability RTY, and the project
                              goal RTY?
                             Does actual process performance indicate a need for a breakthrough project?
                             Would we need a breakthrough project if we operated up to capability?
                             Would focusing on a subset of CTx’s achieve the project goals at lower cost?














































                                                             226
   238   239   240   241   242   243   244   245   246   247   248