Page 226 - Urban Construction Project Management
P. 226

Drawings and Specifications  181
             • Ensure consistency between the architectural drawings and the consultant’s draw-
               ings as far as dimensions and locations
             • Ensure mechanical and electrical coordination (i.e., power shown for hot water heater)
           6. Review shaft openings for proper fit of all devices.
             • Elevators (and other conveying systems)
             • Pipes (drainage, sanitary, water, etc)
             • Duct work
             • Conduits
             • Chilled and condenser water lines
             • Vents
             • Dampers (control, smoke, and fire)
             • Clearances
             • Conflicts
           7. Make a list of major components for potential long lead items.
             • Elevators (and other conveying systems)
             • Mechanical equipment
             • Curtain wall
             • Special steel sections
             • Utility equipment
             • Electrical switch gear
             • Bus ducts
             • Transformers
             • Generators
             • Pumps
             • Millwork
             • Stone
             • Light fixtures
             • Hardware
             • Special doors
           8. Review utilities
             • Are all of the following shown?
               • Water
               • Sanitary
               • Electrical
               •Gas
               • Steam
               • Cable
               • Communications