Page 322 -
P. 322

Collaboration Exercise 7


                                                                                           Make Permit Copies           321

                                                        Receive Permit Application
                                                                                               Highway
                                                                      Engineering             Department
                                                                        Copy         Health     Copy
                                                                                   Department
                                                                                      Copy





                                                            Engineering          Health Department   Highway Department
                                                              Review                 Review               Review


                                                            Approved or             Approved or         Approved or
                                                           Rejected Permit         Rejected Permit     Rejected Permit





                                                                                   Analyze Results




                                                                                  Any Rejection?

                                                                        Yes                         No




                    Figure 7-22
                    Building Permit Process,
                    Revised Version                            Reject Permit                          Approve Permit


                    responded to this problem  by  having the  clerk  who  analyzed      7-7.  Using Figure 7-8 as an example, redraw Figure 7-21
                    results cancel the reviews of other departments when a rejection   using an enterprise information system that processes
                    was received. However,  that  policy  was exceedingly unpopular   a shared database. Explain the advantages of this sys-
                    with the permit applicants, because once the problem in a rejected   tem over the paper-based system in Figure 7-21.
                    application was corrected, the permit had to go back through the      7-8.  Using Figure 7-10 as an example, redraw Figure 7-22
                    other departments. The permit would go to the end of the line and   using an enterprise information system that processes
                    work its way back into the departments from which it had been   a shared database. Explain the advantages of this sys-
                    pulled. Sometimes this resulted in a delay of 5 or 6 weeks.  tem over the paper-based system in Figure 7-22.
                       Cancelling reviews was unpopular with the departments as
                    well, because permit-review work had to be repeated. An appli-     7-9.  Assuming that the county has just changed from the
                    cation might have been nearly completed when it was cancelled   system in Figure 7-21 to the one in Figure 7-22, which
                    due to a rejection in another department. When the application   of your answers in questions 7-7 and 7-8 do you think
                    came through again, the partial work results from the earlier   is better? Justify your answer.
                    review were lost.
                                                                            7-10.  Assume your team is in charge of the implementation
                       7-6.  Explain why the processes in Figures 7-21 and  7-22   of the system you recommend in your answer to ques-
                           are classified as enterprise  processes rather  than de-  tion 7-9. Describe how each of the five challenges dis-
                           partmental processes.  Why  are these processes  not   cussed in Q7-6 pertain to this implementation. Explain
                           interorganizational processes?                        how your team will deal with those challenges.
   317   318   319   320   321   322   323   324   325   326   327