2-10   WATER AND WASTEWATER ENGINEERING

                               80
                               70
                              Monthly discharge, m 3 /s  50
                               60

                               40
                               30
                               20
                                                                Trendline equation: y = 35.494e  0.0352x
                               10
                                0
                                 0          20         40          60         80         100
                                                   Percent of time equaled or exceeded
                            FIGURE 2-3
                            Complete series analysis for Troublesome Creek at Nosleep.



                              Example 2-1.   Perform a complete series analysis on the Troublesome Creek data in  Table 2-7 .
                            Determine the mean monthly discharge. If the average demand for Nosleep’s municipal sup-
                                       3
                            ply is 0.25 m  /s, and the regulatory agency will permit a withdrawal of 5% of the flow, will the
                            Troublesome Creek provide a safe yield?

                              Solution.   A spreadsheet was used to perform the calculations and plot the duration curve. The
                            first few values in the spreadsheet are shown below. A sample calculation for the spreadsheet is
                            shown below the spreadsheet.

                                                           3
                            Rank           Monthly discharge, m /s  % of time equaled or exceeded
                            1                     69.1                   0.38
                            2                     59.8                   0.76
                            3                     56.6                   1.14
                            4                     47.4                   1.52
                            5                     45.1                   1.89
                            6                     41.1                   2.27
                            7                     40.8                   2.65


                                 There are 264 values in the table (12 months/year     22 years of data). The highest discharge
                                             3
                            in the table is 69.1 m  /s. It is assigned a rank of 1.
                                The percent of time this value is equaled or exceeded is:

                                                                  1
                                                     % of time       ( 100 %  0 38 %
                                                                          )
                                                                               .
                                                                 264
                               The plot of the duration curve is shown in  Figure 2-3 . From the data sort, find that the flow rate
                                                                3
                            that is exceeded 50% of the time is 5.98 m  /s.
   62   63   64   65   66   67   68   69   70   71   72