Page 150 - Well Control for Completions and Interventions
P. 150

142                                Well Control for Completions and Interventions







                                                    Annular preventer
                          Annular preventer

                                                   Ram preventer
                         Ram preventer             Choke and kill line outlet
                                                   Ram preventer
                         Ram preventer             Choke and kill line outlet

                          Drilling spool           Ram preventer

                         Ram preventer             Drilling spool

                            Wellhead                  Wellhead

          Figure 4.3 Blow out preventer configuration for 10,000 and 15,000 and 20,000 psi
          working pressure.


                For a two-ram configuration, most operators and drilling contrac-
             tors recommend configuring the stack with a shearing blind ram
             (SBR) below a pipe ram (or annular preventer). This allows a joint of
             pipe to be placed on top of a leaking blind ram and the closure of the
             pipe ram above a tool joint. The pipe in the BOP must have a FOSV
             installed and the space between the bottom of the pipe ram and the
             top of the blind ram must be long enough to accommodate the tool
             joint.
                Having the blind ram below the pipe ram (or annular) allows the
             pipe ram seals (or annular seal) to be changed out when the blind ram
             is shut.
          2. Configuration for 3000 and 5000 psi working pressure BOP stacks
                The minimum requirements for 3000 and 5000 psi BOP stacks are
             fundamentally the same. The stack should have:
             •  Annular preventer.
             •  Two pipe ram preventers (either a double ram preventer or two
                singles).
             •  Kill and choke lines can be connected to the inlet of the ram BOP
                or to a drilling spool.
             •  Kill and choke line must be at least 2 in. nominal diameter.