144                                Well Control for Completions and Interventions







                                              Annular preventer



                                              Pipe ram
                                              Shearing blind ram


                      Upper kill line                Upper choke line

                                            Pipe ram
                                            Pipe ram or VBR
                     Lower kill line                  Lower choke line



                                             Wellhead

          Figure 4.4 Example configuration for a blow out preventer stack with four ram
          preventers.

          4. Annular preventer and four ram preventers
                Many operating companies have a policy of using four ram preven-
             ters on high-pressure wells (,10,000 psi) and hazardous wells (H 2 S).
             Having one more rams than the API minimum recommendation has
             several advantages:
             •  Two pipe rams allow ram-to-ram stripping with the third ram used
                as a safety ram.
             •  Allows two-ram sizes when running a tapered completions string.
                A VBR in the position provides back-up for both pipe rams.
                A typical configuration is to position a drilling spool between two
             double ram blocks with the rams equipped (bottom up) with pipe (or
             VBR), pipe, shear/blind, and pipe (Fig. 4.4).





               4.3 ROUTINE TESTING OF BLOW OUT PREVENTION
               EQUIPMENT

               Blow out prevention equipment is emergency equipment and must
          be maintained in proper working order. A strict regime of routine