Page 159 - Acquisition and Processing of Marine Seismic Data
P. 159

FIG. 2.93  Minimum offset plot from rGPS data for all eight streamers for each shot along the line.









































           FIG. 2.94  Comparison of navigation first break arrival times (red crosses) and linear moveout corrected direct arrivals for
           the first 150 shots of each streamer to ensure that the minimum offset value (150 m) is within the survey limits.
   154   155   156   157   158   159   160   161   162   163   164