158                           2. MARINE SEISMIC DATA ACQUISITION
















           FIG. 2.103  Checking for the gun flag in case of flip-flop shooting by plotting the shot coordinates of both arrays for all shot
           points.


           2.6.5 QC Reporting                              weather conditions within the survey period
                                                           with minimum and maximum expected
              An integral part of the QC processes is to doc-  wave heights, to predict overall stand-by
           ument and reporting of the quality control prod-  percentage caused by bad weather
           ucts and results. Several digital and hardcopy  conditions.
           deliverables are produced during offline QC  c. Acquisition pattern and survey plan: Preplot
           analyses and are delivered to the client periodi-
                                                           maps of the sail lines, start and end
           cally during the survey. In addition, a final   coordinates, total number of predicted shot
           report consisting of the necessary information  points, length and bearing information of
           on the data acquisition, processing, and QC     each prime line, proposed line acquisition
           results are prepared at the end of the survey.
                                                           pattern, definition of turning radius, vessel
                                                           speed during the line changes, run-in/
           2.6.5.1 Mobilization Report
                                                           run-out distances to estimate the approximate
              A mobilization report mainly describing the  line change times, total kilometers of
           project plans such as, methodology, equipment,
                                                           prime lines, and estimated size of the
           documentation, predicted survey schedule and
                                                           survey area.
           acquisition parameters, is prepared just before
                                                        d. Logistics: Information about the agents,
           the survey and submitted to the client for
                                                           shipments before/during/after the survey,
           approval. In general, a mobilization report con-
                                                           periods and procedures for crew change,
           tains a detailed description of the following
                                                           chase boat(s), procedure for fuel supply
           items:
                                                           during the survey period.
           a. Description of the survey and scope of the work:  e. Data acquisition parameters: Description of the
              Definition of the survey area, corner        survey, geodesy, source and streamer as well
              coordinates and maps of the whole survey     as binning parameters optimally determined
              zone, and overall bathymetry.                by the survey design process, and tolerance
           b. Environmental implications: Possible         values of each parameter. An example
              obstructions that may cause undershooting,   acquisition parameter list, including the
              such as production or drilling platforms,    tolerance values for a conventional 3D survey
              fishing activities, marine traffic, permanent  is shown in Table 2.17.
              buoys, etc., regional tides and magnitude and  f. Equipment and software: Vessel information,
              direction of surface currents, expected      a complete list of model/brand of all
   162   163   164   165   166   167   168   169   170   171   172