Chapter 8. Novel gas turbine cycles          145

                                        FUEL (METHANE)











                           f  AIR                     7,
                                                        [JTzg:  -0
                                              HRSG

                            COZ CHEMICAL              7,   .  CYCLE
            4                ABSORPTION,  -1   COOLER    WAER
                             STRIPPING               CONDENSATE  ’





           Fig. 8.6. Cycle AI. Direct removal of (2% from an existing plant (after Chiesa and Consonni [l]).

       with  some  56% efficiency, through  addition of  the  absorption  equipment. They  also
       performed a detailed estimate of the extra capital cost, and found that the cost of electricity
       increased by  some  40%, from  3.6 ckWh for the  basic  plant  to  5 c/kWh, due  to  the
       combined effect of lower efficiency and higher capital cost.


                                    FUEL (METHANE)
                      AIR
                                     I







                       t


                                         HRSG r  $-zE-~ CYCLE
                                         .      ,              I

                               COOLER
                            L      A      .  WATER  LPSTW  I
                            ABSORPTION,
                                              LIQUEFACTION      LIQUID C02

              Fig. 8.7. Cycle A2. Semi-closed plant plus COz removal (after Chiesa and Consonni [ 11).