Chapter 8. Novel gas turbine cycles 145
FUEL (METHANE)
f AIR 7,
[JTzg: -0
HRSG
COZ CHEMICAL 7, . CYCLE
4 ABSORPTION, -1 COOLER WAER
STRIPPING CONDENSATE ’
Fig. 8.6. Cycle AI. Direct removal of (2% from an existing plant (after Chiesa and Consonni [l]).
with some 56% efficiency, through addition of the absorption equipment. They also
performed a detailed estimate of the extra capital cost, and found that the cost of electricity
increased by some 40%, from 3.6 ckWh for the basic plant to 5 c/kWh, due to the
combined effect of lower efficiency and higher capital cost.
FUEL (METHANE)
AIR
I
t
HRSG r $-zE-~ CYCLE
. , I
COOLER
L A . WATER LPSTW I
ABSORPTION,
LIQUEFACTION LIQUID C02