Page 73 - Applied Process Design For Chemical And Petrochemical Plants Volume III
P. 73

66131_Ludwig_CH10B  5/30/2001 4:17 PM  Page 52
                                                  Applied Process Design for Chemical and Petrochemical Plants
                  52
                                                                                                                                         Figure 10-27B. Effective tube length correlations for calculating outside surface areas of U-tube bundles (two or four passes). (Used by permission: D. L. Whitley and E. E. Lud-



























                                                                                                                                           wig, Chemical Engineering. V. 67, No. 6 © 1960. McGraw-Hill, Inc. All rights reserved.)
   68   69   70   71   72   73   74   75   76   77   78