External Loads  19









                                       P
                                      r


                                                  P
                                                 r
           H  B c




                                                           P
                                                         r














                                                   C c
         Figure 2.5 Diagram for coefficient C c for positive projecting conduits. (Reprinted by per-
         mission, from Spangler and Handy, Soil Engineering, 4th ed., Harper & Row, 1982.)







         TABLE 2.2 Values of C c in Terms of H/B c
         Incomplete projection condition K    0.19  Incomplete ditch condition K    0.13
              r sd p     Equation             r sd p    Equation
              0.1    C c   1.23 H/B c   0.02   0.1   C c   0.82 H/B c   0.05
              0.3   C c   1.39 H/B c   0.05    0.3   C c   0.69 H/B c   0.11
              0.5    C c   1.50 H/B c   0.07   0.5   C c   0.61 H/B c   0.20
              0.7   C c   1.59 H/B c   0.09    0.7   C c   0.55 H/B c   0.25
              1.0   C c   1.69 H/B c   0.12    1.0   C c   0.47 H/B c   0.40
              2.0    C c   1.93 H/B c   0.17
           SOURCE: Reprinted from Spangler and Handy, Soil Engineering, 4th ed., Harper & Row,
         1982, by permission of the publisher.