Page 39 - Buried Pipe Design
P. 39

External Loads  17







                 H  H e



                       D                 C


                               h
           H




                             dh





                       A                B

                                                    s m  s g
                 s f  d c

             pB c


                                                   s g


                                             s f
                               (b)
         Figure 2.4 (Continued)



           In conjunction with positive projecting conduits, Marston determined
         the existence of a horizontal plane above the pipe where the shearing
         forces are zero. This plane is called the plane of equal settlement. Above
         this plane, the interior and exterior prisms of soil settle equally. The
         condition where the plane of equal settlement is real (it is located within
         the embankment) is called an incomplete projection or an incomplete
         ditch condition. If the plane of equal settlement is imaginary (the shear
         forces extend all the way to the top of the embankment), it is called a
         complete ditch or complete projection condition.