Production and Capital Cost Estimation                          79

                 Finally,  the total capital cost for the project  equals the  sum of the fixed  capi-
            tal cost and  working capital.

               = 478,700 + 0.20  (478,700) = $574,400
            C T




            NOMENCLATURE
            b    capacity exponent  for operating  labor estimation

            C    cost
            C A  actual equipment cost
            CAI  actual equipment cost, installed
                 base equipment cost
            C B
            CBI  base equipment cost, installed

            C D  depreciable capital cost
            C F  fixed capital cost
            CM   production or manufacturing cost
            Cs   delivered equipment cost

            C P  purchased or FOB cost
                 purchased  equipment  cost based on actual process conditions
            Cp A
            Cp B  purchased equipment cost based on base process conditions
                 (ordinary pressures, temperatures, and materials)
                 total capital cost
            C T
                 working capital
            C w
            f AB  auxiliary-facilities  factor  + buildings factor  (fraction  of base cost)
            fcp  contingency and contractor's fee factor  (fraction  of actual or base cost)

            fo   design factor  (fraction  of base equipment cost)
            foe  direct-cost factor (fraction  actual or base cost)
            fie  indirect-cost factor  (fraction  of actual  or base cost)
            fi   installation factor
                 site development  factor  (fraction  of  depreciable  capital  cost)
            f L