Page 96 - Chemical process engineering design and economics
P. 96

Production and Capital Cost Estimation                          81

              9.  Bridgewater, A.V., The Functional Approach to Rapid Cost Estimation,
                  AACE Bulletin,  18, 5,  153,  1976.
             10.  Woods, DR., Financial Decision Making in the Process Industry, Prentice
                  Hall, Englewood Cliffs, NJ,  1975.
             11.  Holland, F.A., Watson, F.A., Wilkinson, J.K., Introduction to Process
                  Economics, John Wiley & Sons, New York, NY,  1974.
             12.  Kohn, P., Ethylenediamine Route Eases Pollution Worries, Chem.
                  Eng., 85, 7, 90,  1969.
             13.  Guthrie, K.M., Data and Techniques for Preliminary Cost Estimating,
                  Chem.  Eng., 76, 7, 114,1969.
             14.  Lang, H.J., Simplified Approach to Preliminary Cost Estimates,
                  Chem. Eng., 55, 6,  112, June  1948.
             15.  Popper, H., ed., Modern Cost Engineering Techniques, McGraw-Hill,
                  New York, NY,  1970.
             16.  Chilton, C., Popper, H., Norden, R.B., Modern Cost Engineering:
                  Methods and Data, McGraw-Hill, New York, NY,  1979.
             17.  Chilton, C.H., Arnold, T.H., New Index Shows Plant Cost Trends,
                  Chem.  Eng,  70,4,  143,  1963.
             18.  Matley J,  CE Plant Cost Index - Revised, Chem.  Eng., 89, 8,  153,
                  1982.
             19.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York, NY,  1973.
             20.  Valle-Riestra, J.F., Project Evaluation in the Chemical Process Indus-
                  tries, McGraw-Hill, New York, NY,  1983.
             21.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York, NY,  1993.
             22.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York, NY,  1995.
             23.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York, NY,  1996.
             24.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York, NY,  1997.
             25.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York,  NY,  1998.
             26.  Student Contest Problem, American Institute of Chemical Engineers,
                  New York, NY,  1985.
             27.  Holland, F. A,  How to Evaluate Working Capital, Chem.  Eng,  81, 7, 7
                  1, Aug. 5,1974.
             28.  Hand, W. E,  From Flow Sheet to Cost Estimate, Petroleum Refiner,  3 7,
                  9,  13 3,  1958.
             29.  Remer, D. S,  Chai, L.H,  Design Factors for Scaling-up Engineering
                  Equipment, Chem. Eng. Progr, 87, 8, 77,  1990.
             30.  Walas, S.M,  Chemical Process Equipment, Butterworths, Boston, MA,
                  1988.




         Copyright © 2003 by Taylor & Francis Group LLC
   91   92   93   94   95   96   97   98   99   100   101