Page 324 - Design for Six Sigma for Service (Six SIGMA Operational Methods)
P. 324

6 2 35 25 3       interface  16. Support spec/capability/  15. Supply interface  14. Supply risk  13. Supply time  12. Supply cost  11. Supply spec/capability/means  36 11 2 35 27 11 26 2 5 13 11 39 30 31 21  35  2   39 15 6 1 5 13  27 6 1 10 10 38 13 11 13 2 16 10 19 35

                        5 7 37 1 4 10. Production interface  15 35 10 25   24  25 23 35 29 2   13  7 3 17 23 24  28 40 6 29 13   31 30  3 25 17 35 12   13  26 1 37 25 2   28  10 15 38 20   27 6 3  5 6 23 20 7 10   25  6 2 37 40 10  5 30 10 15 2   12  5 35 6 13 17   10 24  23 33 5 26 2   33 5 2 2


                        3 5 10 2 23 12 9. Production risk  6 7 23 26 13  6 15 7 37 13 9  11 23 39 7 9   33  7 5 3 37 10  6 27 35 22 12   37  26 10 1 3 25   12  10 27 15 6 3   22 29  5 6 23 20 7 10   25  5 25 3 35 2 10  5 35 23  25 2  13 22 25 1 10  5 26 35 2 25  5 10 40 2 4 25




                   What is deteriorated ?

                     What should be Improved?  1. R&D spec/capability/means  2. R&D cost  3. R&D time  4. R&D risk  5. R&D interface  6. Production spec/capability/means  7. Production cost  8. Production time  9. Production risk  10. Production interface  11. Supply spec/capability/means  12. S















                                                                  291
   319   320   321   322   323   324   325   326   327   328   329