Dust Explosions: An Overview  85















                                   PRESSURE  IN VESSEL
                                   f










                                                      TIME




     Figure 1.94  The basic principle of dust explosion venting: Provision of an opening controlled dis-
     charge of unburned, burning, and burned dust cloud keeps the maximum pressure inside the vessel
     below a predetermined limit, Pred.







       k







                                            Figure 1.95  Reinforced vented 6 m3 bag filter
                                            enclosure:  Pred = 0.4 bar(@, pressure-shock-resist-
                                            ant construction. The vent cover is a 0.85 m2 three-
                                            layer bursting panel (Courtesy of lnfastaub Brilon,
                                            Rembe, Germany).


     1.4.6.2
     Vent Area Sizing

     Through the systematic work by Bartknecht (1978) and others, it has become generally
     accepted that the required area of the vent opening depends on the