15/496  Industrial Power Engineering and Applications Handbook
               voltage developed in the secondary circuit in the   for motors and discussed in Section 9.6.1 is advisable as a process
              event of an accidental secondary open circuit on   test to monitor the quality of an HV insulation system, during the
              load. The inter-turn  insulation  of  the windings   course of manufacture and using the Fame value for future reference
              should be capable of  withstanding an inter-turn   when checking the quality of  insulation when energizing or during
              overvoltage of 4.5 kV peak across the complete   a field test.
              secondary winding. The test may be conducted
              by keeping the secondary winding open circuited
              and applying a primary current less than or equal   List of formulae used
              to the rated primary current for 1 minute, sufficient
              to produce a voltage at the secondary terminals   Differential ground fault protection
              equal to 4.5 kV (peak).
           (VI  Power  frequency  withstand  test  on primary   Current setting of the relay,
               windings
               This test is same as for item (iv) (a), under type   Zpf  = n (N x Z,  + Is,)   (15.1)
               tests.                                  Ipf = minimum fault current through the primary rcquired
                                                           to trip the relay
         Note                                           n = turn ratio of  the CTs
         A repeat  power frequency  test, if  considered  necessary,  must  be   Z,,,  = magnetizing  current  of  the CTs  corresponding  to
         performed  at 80% of the prescribed  test voltage. See also Section   the V,
         14.5.                                          Z,, = relay current setting
                                                        N = no. of  CTs falling in parallel
           (vi) Partial discharge measurement
           (vii) Verification of accuracy              To limit the peak voltage
               This test is the same as under type test item (vi)
         3  Special tests                               v, = 2Jz  ,'V,(V,   - v,,            (15.2)
           The following additional tests may be conducted when
           considered necessary:                        Vp = peak voltage across the relay
           (i)  Chopped  lightning  impulse  test.  Refer  to  IEC   V, = theoretical maximum CT secondary voltage across
              60044- 1                                      the  relay  circuit  at  the  maximum internal  fault
           (ii)  Measurement of the dielectric dissipation factor   current
              (tan a, applicable to only liquid immersed primary   V, = knee point voltage
              windings, rated for 110 kV and above.
                                                       Further reading
         Note
         For  lower  voltage  systems, say,  2.5  to  10 kV,  measurement  of   Pmtecrive Relays and Application Guide, GEC Measurement, General
         dielectric loss factor tan 6, along similar lines, to those recommended   Electric Co. Ltd, Stafford, Uk.