Page 103 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 103

76  Industrial process plant construction estimating and man-hour analysis


            4.6 Scope of field work required for structural steel and boiler
            casing

               Erect boiler structural steel
                  Column line “1” (west)
                  Column line “6” (east)
                  Column line “7” (east)
                  Column line “A” (north)
                  Column line “B” (north)
                  Column line “F” (south)
                  Column line “G” (south)
                                                         00
                                                               0
               Install platform, grating, and handrail @ El. 100 -0 to 184 -0 00
                                                       0
               Install stair nos. 1 and 2
               Erect penthouse steel
               Erect casing—generating bank, boiler, and penthouse

            4.7 Structural steel and boiler casing estimate data

            4.7.1 Structural steel sheet 1

            Description                                           MH    Unit
            Erect boiler structural steel (stairs, platforms, grating, and handrails)
            Main steel                                            24.00  Ton
            Platform framing                                      0.15  SF
            Grating                                               0.20  SF
            Handrail                                              0.25  LF
            Erect penthouse steel                                 24.00  Ton
            Install platform, grating, and handrail @ El. 100 -0 to 184 0
                                              0
                                                00
                                                     0 00
            Platform framing                                      0.15  SF
            Grating                                               0.20  SF
            Handrail                                              0.25  LF
            Install stair nos. 1 and 2
            Structural steel                                      24.00  Ton
            Platform framing                                      0.15  SF
            Grating                                               0.20  SF
            Handrail                                              0.25  LF
            Stair treads                                          0.85  EA