Industrial package boiler Chapter  6 107


             6.8 Field erected package boiler installation man-hours estimated
             actual


                                                              BM         BM
             Install steam and mud drums                      0          0
             Generating bank tubes                            0          0
             Baffles, metallic; place and weld with clips     0          0
             Floor and hopper support steel; place and weld   0          0
             Tube furnace and convection                      0          0
             Burner and wind box                              0          0
             Floor plate                                      0          0
             Sootblower wall boxes include welding            0          0
             Sootblower piping includes welding               0          0
             Piping                                           0          0
             Doors and frames; place and weld to tubes and/or casing  0  0
             Feedwater regulator                              0          0
             Shop-assembled superheaters                      0          0
             Tube welding; over 2-1/2 and including 3 TIG (1000 PSI)  0  0
                              00
                                          00
             Field-erected package boiler installation man-hours  0      0


             6.9 General scope of field work required for each air heater

                Erect support steel
                Set air heater modules
                Set plenums
                Erect interconnecting ductwork