6.16 FD Fan Installation Man-Hours
Estimated Actual
BM MW MH
Set and assemble FD fan 0 0 0 0
Steam coil air heater 0 0 0
FD fan installation man-hours 0 0 0 0
6.17 Field erected package boiler man-hour breakdown
Estimate
BM IW MH
Field-erected package boiler installation 0 0
Air heater installation 0 0
FD fan installation 0 0 0