Industrial package boiler Chapter  6 111


             6.16 FD Fan Installation Man-Hours

                                             Estimated              Actual
                                          BM         MW         MH

             Set and assemble FD fan      0          0          0          0
             Steam coil air heater        0                     0          0
             FD fan installation man-hours  0        0          0          0



             6.17 Field erected package boiler man-hour breakdown

                                                            Estimate
                                                  BM          IW         MH
             Field-erected package boiler installation  0                0
             Air heater installation              0                      0
             FD fan installation                  0           0          0


             Field-erected package boiler man-hours  0        0          0