144   Industrial process plant construction estimating and man-hour analysis


            8.4 General scope of field work required for each coal-fired
            boiler sheet 3


               Scope of Work-Field Erection
               Pressure Parts
               Install and Weld Attemperators, Superheater, and Reheat Components
               Final Secondary Superheater
               Tubes—connecting
               Tubes—sections
               Headers
                                                      00
                                            00
               Weld tubes to header stubs—(3-1/2 < BW   4 TIG) (2001–2600) psi
               Fit and weld filler bar at tube welds
               First and Second Stage Attemperators
               Spray type—complete with body and internals (excludes welding)
               Drum type—complete with internals, piping, valves, and supports (excludes
               welding)
                                                         00
               Connecting tubes (4-1/2 welded to stub above and 4 expand in drum, weld
                                  00
               to header)
                00
               4 OD, expand tubes in drums (2000 psi)
                                          00
               Weld Tubes to header stubs—(4 < BW   4-1/2 TIG) (2001–2600) psi
                                                       00
               Intermediate Secondary Superheater-Pendant/Inverted Loop
               Headers
               Supports—rods
               Tube sections
               Tube section supports
               Saturated connections
               Mountings Seals
               Seals
                                                      00
               Weld tubes to header stubs—(3-1/2 < BW   4 TIG) (2001–2600) psi
                                            00