Page 169 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 169

Coal-fired power plant Chapter  8 145


             8.5 General scope of field work required for each coal-fired
             boiler sheet 4


                Platen Secondary Superheater-Pendant/Inverted Loop
                Headers
                Supports—rods
                Tube sections
                Tube section supports
                Saturated connections
                Mountings seals
                Seals
                                                       00
                                             00
                Weld tubes to header stubs—(3-1/2 < BW   4 TIG) (2001–2600) psi
                Reheat Superheater-Pendant/Inverted Loop
                Headers
                Supports—rods
                Tube sections
                Tube section supports
                Saturated connections
                Mounting seals
                Seals
                                             00
                                                       00
                Weld tubes to header stubs—(3-1/2 < BW   4 TIG) (2001–2600) psi
                Primary Superheater-Pendant/Inverted Loop
                Headers
                Supports—rods
                Tube sections
                Tube section supports
                Saturated connections
                Mounting seals
                Seals
                                                       00
                                             00
                Weld tubes to header stubs—(3-1/2 < BW   4 TIG) (2001–2600) psi
   164   165   166   167   168   169   170   171   172   173   174