Coal-fired power plant Chapter  8 147


             8.7 General scope of field work required for each coal-fired
             boiler sheet 6


                Boiler Equipment
                Floor and hopper support steel
                Suspension steel
                Backstays
                Erect casing panels and assemblies
                Fit and weld casing seams
                Burner wine box—primary, secondary, and tertiary
                Hoppers
                Doors and frames
                Seals
                Expanded metal lathe
                Closure plates
                Coal, volumetric, or gravimetric feeders
                Burners
                DRB-4Z low Noᵪ coal burner
                Dual zone Noᵪ port (overfired air system)
                Inter tube burners include blocks, tips, and riffle casings
                Automatic lighters include welding

                Diamond Boiler Cleaning Equipment—Retractable Soot blower
                Soot blower SB, SB w/puff
                Pressure reducing station
                Trays and channels for supporting tubing
                Tubing for automatic sequential air operation
                Air compressor and/or receiver
                Auto sequential panel or air master controller
                IK structural supports