62 Industrial process plant construction estimating and man-hour analysis
3.3.4 Pump—Centrifugal sheet 4
Description HP range MH Unit
Feed charge pump (centrifugal) 501–5000 0.60 HP
6 4 4 7.5ton HP 600
0
0
0
Wash water pump (centrifugal) 31–50 2.00 HP
6 4.5 3.5 1.5ton HP 40
Stripper overhead pump (centrifugal) 76–100 1.50 HP
8 3 1.8ton HP 100
Stripper bottoms pump (centrifugal) 126–300 1.25 HP
9 3.5 3.5 2ton HP 200
Stripper overhead water pump (centrifugal) 0–1 24.00 HP
6 3 3 0.75ton HP 0.75
3.3.5 Filter and reactor sheet 5
Description Weight range tons MH Unit
Fuel gas filter 0.2 ton 1 24 EA
Diolefin reactor ID-ft 9 T/T-ft 16 65 ton 61–100 5.5 Ton
Hydrotreating reactor ID-ft 9 T/T-ft 80 276 ton 201–250 3.2 Ton
3.4 Stripper unit estimate
3.4.1 Vessels/columns—Pressure equipment sheet 1
Historical Estimate
Description MH Qty Unit Qty Unit BM
Stripper vertical tower 0
0
0
Stripper ID 7 T/T 116 55 ton 9.45 55.0 Ton 0 Ton 0
Install double downflow valve trays 30.0 16.0 EA 0 EA 0
Install demisting pads (single grid support, 48.0 1.0 EA 0 EA 0
pad, and grid top)
Vortex breaker 32.0 1.0 EA 0 EA 0
Remove and replace manway cover (24 00 40.0 1.0 EA 0 EA 0
300# Removable-Davit)
Install platforms and ladders 40.0 1.5 Ton 0 Ton 0