Page 92 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 92
64 Industrial process plant construction estimating and man-hour analysis
3.4.4 Pump—Centrifugal sheet 4
Historical Estimate
Description MH Qty Unit Qty Unit BM
Pump—centrifugal 0
Feed charge pump (centrifugal) 0.60 600.0 HP 0 HP 0
0
6 4 4 7.5 ton
0
0
Wash water pump (centrifugal) 2.00 40.0 HP 0 HP 0
6 4.5 3.5 1.5 ton
Stripper overhead pump (centrifugal) 1.50 100.0 HP 0 HP 0
8 3 3 1.8 ton
Stripper bottoms pump (centrifugal) 1.25 200.0 HP 0 HP 0
9 3.5 3.5 2 ton
Stripper overhead water pump (centrifugal) 24.00 0.8 HP 0 HP 0
6 3 3 0.75
3.4.5 Filter and reactor sheet 5
Historical Estimate
Description MH Qty Unit Qty Unit BM
Filter and reactor 0
Fuel gas filter 24 1 EA 0 EA 0
Diolefin reactor ID-ft 9 T/T-ft 16 5.5 65 Ton 0 Ton 0
Hydrotreating reactor ID-ft 9 T/T-ft 80 3.2 276 Ton 0 Ton 0