Page 221 - Membranes for Industrial Wastewater Recovery and Re-Use
P. 221

190  Membranes for Industrial Wastewater Recovery and Re-use
























                         50     1 on   150    200    250    300   350    4011
                                           Mass load [t/h]
                       Figure 4.10  Construction of  the water supply linefor contaminant 1



                      Contaminant 2





                                                 /
                                            ’
                                              /
                                                 Water supply line for contaminant two,
                                        . /      revealing a flowrate of 2,33 rih.
                                       /







                   n     50     I no   150    200    250    300    350    400
                                           Mass load [th]
                       Figure4.17  Constructionofthe watersupply linejorcontaminant 2


           and its  application,  nearly  all  practical  cases  concern multiple-contaminant
          matrices. It should be stressed that, although applicable for this case, it is not
           generally the case that the overall target flow rate, based on all contaminants in
          a  multiple-contaminant  system,  corresponds  to  the  highest  value  flow  rate
          observed when constructing the water supply lines.
   216   217   218   219   220   221   222   223   224   225   226