Risk assessment and  inspection for  integrity


         3. The  tangible  benefits  of prevented  failures  in  the  medium  term  are
      estimated  to represent  70% of the programme cost  in the  last three  years.
         4. In addition to the benefits of prevented  failures, the intangible benefits
      of confidence in critical parts of our pipeline system and a demonstrated  pro-
      active  attitude  to  preventing  failures  are  sufficient  to  consider  the  overall
      programme  as cost effective.




        REFERENCES


      1.  B.Sutor  and  W.C.Rappel,  1990.  Corrosion  may  close  Alaska's oil  pipe,
        Toronto  Star, 5th February 5.
      2.  Pipeline  Safety  Re-authorization Act of  1988,  Public  Law 100-561,  100th
         Congress,  Sec. 304,  31st  October,  1988.
      3.  National Energy Board  Report,  "In  the  Matter of  an  Accident  on  19th
        February,  1985,  near Camrose, Alberta  "June  1986,  p.31.
      4. T.M.Sowerby,  1990.  Pipeline inspection  first  stage in rehabilitation,  Pipe-
        line, October,  p.2.
      5. RJohn,  1990.  External pipeline  rehabilitation, Pipeline, October, p.4.
      6.  Second  annual Pipeline Rehabilitation seminar, Houston, Texas,  Septem-
        ber  1990.
      7. D .A.Bacon,  1990.  Enron's approach  and experience in pipeline  rehabilita-
        tion,  Second  annual  Pipeline  Rehabilitation  seminar,  Houston,  Texas,
        p. 153.
      8. G.Avrin and R.I.Coote,  1987.  On-line inspection  and analysis for integrity,
        Pacific  Coast  Gas Association  Transmission  Conference,  Salt  Lake City,
        Utah, March.
      9. G.Clerehugh and A.E.Knowles,  1979.  The experience  of the  British Gas
        Corporation  in the use of on-line inspection equipment on high pressure
        gas transmission pipelines,  14th World Gas Conference, Toronto,  Ontario,
        p.8.
      10.  British  Gas Engineering  Standard  BGC/PS/OLI  1,  Code  of practice  for
        carrying out  on-line inspection  of gas transmission  systems,  British Gas
        Corporation,  London, UK, 1983,  p.9.
      11. R.MJamieson  and J.S.MacDonald,  1986.  Pipeline  monitoring, Proc. 9th
        annual  Energy  Sources  Technology  Conference  and  Exhibition,  New
        Orleans, Louisiana, February. ASME Petroleum  Div., 3, pp.113-118.
      12. M.J.Davis,  1988.  Tenneco's efforts  for verifying  pipeline  integrity, AGA
        Distribution/Transmission Conference, Toronto,  Ontario, May.