15/350 Risk Management
           As the technical lead and hands-on position for the program,   reports  shall present  information concerning the  goals  and
           the  RMP  coordinator position could  involve more  than one   implementation of the risk management program, the relevant
           individual. It is often advantageous to assign risk management   input data, and the current results being acted on. These status
           duties as portions of  several employees’ job  functions. This   reports shall be available for external parties such as federal,
           provides training opportunities and backups for key personnel.   state, and local  regulators, the  public, operators of adjacent
             A  sample  staffing  scenario  could  involve  the  following   facilities, and other stakeholders. Communications for specific
           employees: associate engineer, assistant engineer, and senior   purposes will be custom developed and are at all times under
           drafting aide. A drafting aide could be responsible for collect-   the direct control of the RMP Manager.
           ing, analyzing, and  inputting new  data into  the model. The
           results of the model could be computed and analyzed by the   Documentation
           assistant engineer as a part-time function. The associate engi-
           neer could oversee the program and communicate the results to   All documents produced under this program are to be main-
           the RMP manager.                           tained by the RMP coordinator under the current record reten-
             Examples of  additional roles,  responsibilities and  proce-   tion protocols. Backups of electronic data are to be kept per
           dures are as follows:                      company policy AI.
           Area supervisordmanagers  The supervisors responsible for   Evaluation and Improvement
           system  operations  and  maintenance  will  maintain  current
           information regarding all  conditions  and  activities  in  their   At  least once each year, representatives from  the  following
           respective districts. This information will be delivered to RMP   departments shall meet with the RMP manager to review the
           coordinator per the appropriate procedure(s).   past period’s RMP results and to discuss possible changes to the
                                                      program:
           Corrosion control  This department will maintain the corro-
           sion control database per procedure XYZ. This department will   0  Planning
           respond to RMP coordinator requests for updated information.   Maintenance
             This department will also maintain a current listing of sys-   Quality control
           tem materials and their condition, including coating (if applica-   Corrosion control
           ble) for all pipe and components of the pipeline system. This   Mapping and records
           department will provide the RMP  coordinator with updated   Field operations
           facilities information as it becomes available.   Control center operations.
           GIs, Mapping, and Records  This department will ensure that   The evaluation shall include
           current information  is available on maps,  drawings, and GIS
           databases. Policies and procedures will  be created in concert   The quality and effectiveness of the administration, commu-
           with the RMP coordinator and will be maintained hy this group.   nications, and documentation program elements
                                                        The  quality  and effectiveness of  the  analytical processes
           Personnel qualifications                     used to assess risks, identify possible ways to control these
                                                        risks, allocate resources to control risks in the most cost-
           Personnel involved in the execution of this program must be   effective way, and monitor performance
           adequately  qualified  to  perform  the  specified  duties. This   The impacts of risk management decisions on the choice of
           section lists qualifications and training requirements for all   performance measures
           positions. Specific training is outlined in Procedure ABC.   The conclusions and reassessments about program effective-
                                                        ness resulting from performance monitoring and feedback.
           Management of change
                                                        The  RMP manager has ultimate responsibility for imple-
           The risk management program shall be a part of the manage-   menting any changes.
           ment  of  change  process  as  detailed  in  procedure  MOCI.
           Most changes that would trigger the management of change   Process elements
           procedure would logically have an impact on risk.
                                                      This section of the control document set should describe the
           Communications                             technical and analytical activities comprising the risk manage-
                                                      ment process. These documents serve as the how- to manuals
           Internal: Reports for internal communications will be prepared   for performing risk assessments and using the information in
           by the RMP coordinator at least once each year. These reports   risk  management decision making. Some sample content is
           shall present information concerning the goals and implemen-   shown under each sectioddocument title.
           tation of the risk management program, the relevant input data,
           and the current results being acted on. These status reports shall   Pipeline system covered
           be posted andor distributed so that any interested employee
           can view them.                             This  program  covers  cfill  in  description(s)  of  system(s)
             External:  Reports  for  external  communications  will  be   included in the RMP}. Valve stations, regulator stations, and
           prepared by the RMP coordinator at least once each year. These   direct appurtenances ofthe pipeline are also covered. The {note