Page 26 - Serious Incident Prevention How to Achieve and Sustain Accident-Free Operations in Your Plant or Company
P. 26
CH01pp001-020 4/10/02 12:49 PM Page 11
Heat-activated and/or remote-oper-
Monitoring system for detection of
tem design to limit flow potential
More effective internal corrosion
Capability for activation of valve
Double block & bleed drain sys-
ated pump shutdown and valve
from remote location
water level in vessel
Operator training
isolation
Inadequate drain system design
Lack of prompt shutdown and
Localized internal corrosion
isolation
Property damage: $78 M Effective corrosion/erosion inspec- Erosion/corrosion in elbow tion program Effective checklist for shutdown Drain valve at bottom of vessel Fatalities: 6 and startup of FCC unit improperly closed during shut- Property damage: $23 M Policy limiting valve operation to down, allowing water to un- Business interrupti
Business interruption:
Property damage:
Property damage:
claims reported
$26.3 M
$76 M
Explosion occurred following 6˝ carbon steel elbow rupture and release of hydrocarbon & hydro- gen mixture. During fluidic catalytic cracking (FCC) unit startup, superheated oil was introduced to vessel thought to be empty but which contained water. A steam explosion occurred rupturing vessel and starting fire that engulfed FCC unit.
California USA 1992 (24) Louisiana USA 1991 (25) Texas USA 1991 (26) Pennsylvania USA 1990 (27) Louisiana USA 1988 (28)