586   CHAPTER 13 DECISION ANALYSIS




                         If Oceanview submits the highest bid and obtains  firm that Oceanview Development has worked with
                      the property, the firm plans to build and sell a com-  in the past has agreed to do the study for E15 000.
                      plex of luxury apartments. However, a complicating  The results of the study will be available 1 August, so
                      factor is that the property is currently zoned for  that Oceanview will have this information before the
                      single-family residences only. Glenn believes that a  15 August bid deadline. The results of the survey will
                      referendum could be placed on the voting ballot in  be either a prediction that the zoning change will be
                      time for the November election. Passage of the  approved or a prediction that the zoning change will
                      referendum would change the zoning of the property  be rejected. After considering the record of the mar-
                      and permit construction of the apartments.  ket research service in previous studies conducted
                         The sealed-bid procedure requires the bid to be  for Oceanview, Glenn developed the following prob-
                      submitted with 10 per cent of the amount bid. If the  ability estimates concerning the accuracy of the mar-
                      bid is rejected, the deposit is refunded. If the bid is  ket research information.
                      accepted, the deposit is the down payment for the
                                                                         PðA j s 1 Þ¼ 0:9  PðN j s 1 Þ¼ 0:1
                      property. However, if the bid is accepted and the bidder
                                                                         PðA j s 2 Þ¼ 0:2  PðN j s 2 Þ¼ 0:8
                      does not follow through with the purchase and meet
                      the remainder of the financial obligation within six
                      months, the deposit will be forfeited. In this case, the  where
                      county will offer the property to the next highest bidder.
                                                                    A ¼ prediction of zoning change approval
                         To determine whether Oceanview should submit
                                                                   N ¼ prediction that zoning change will not be
                      the E5 million bid, Glenn conducted some prelimi-
                                                                       approved
                      nary analysis. This preliminary work provided an
                      assessment of 0.3 for the probability that the  s 1 ¼ the zoning change is approved by the
                      referendum for a zoning change will be approved  voters
                      and resulted in the following estimates of the costs  s 2 ¼ the zoning change is rejected by the voters
                      and revenues that will be incurred if the apartments
                      are built.
                                                                  Managerial Report
                              Cost and Revenue Estimates          Perform an analysis of the problem facing the
                                                                  Oceanview Development Corporation, and prepare
                      Revenue from apartment sales   E15 000 000  a report that summarizes your findings and recom-
                      Cost                                        mendations. Include the following items in your
                        Property                      E5 000 000  report:
                        Construction expenses         E8 000 000
                                                                  1 A decision tree that shows the logical sequence
                         If Oceanview obtains the property and the zoning  of the decision problem.
                      change is rejected in November, Glenn believes that  2 A recommendation regarding what Oceanview
                      the best option would be for the firm not to complete  should do if the market research information is
                      the purchase of the property. In this case, Ocean-  not available.
                      view would forfeit the 10 per cent deposit that  3 A decision strategy that Oceanview should follow
                      accompanied the bid.                          if the market research is conducted.
                         Because the likelihood that the zoning referen-
                                                                  4 A recommendation as to whether Oceanview
                      dum will be approved is such an important factor in
                                                                    should employ the market research firm, along
                      the decision process, Glenn suggested that the firm
                                                                    with the value of the information provided by the
                      hire a market research service to conduct a survey of
                                                                    market research firm.
                      voters. The survey would provide a better estimate of
                      the likelihood that the referendum for a zoning  Include the details of your analysis as an appendix to
                      change would be approved. The market research  your report.











                Copyright 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s). Editorial review has
                      deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
   601   602   603   604   605   606   607   608   609   610   611