Lube, Seal and Control Oil System Best Practices Be st Practice 7.5
Fig 7.5.6 Typical pipe sizing chart
Filter sizing
Filter information should be reviewed to confirm correct filter
sizing for the normal and the maximum viscosity case (in the
case of viscous fluids). Additionally, maximum filter collapse
pressure, internal filter cartridge design and cartridge sealing
design should also be reviewed at this time.
Instrumentation
All instrumentation should be reviewed to confirm proper se-
lection, materials of construction and proposed installation lo-
cations. All instrumentation loops should be reviewed to ensure
that critical instrumentation can be calibrated and maintained Fig 7.5.7 Console baseplate construction (Courtesy of Fluid Systems)
while unit is in operation.
Console layout and component arrangement accessibility to pore grout when equipment is installed on the
baseplate.
Having confirmed that component sizing and selection are ac-
ceptable, the console layout and arrangement of components Maintenance accessibility
must be reviewed. Methods of review use either the review of
outline drawings of the proposed arrangement, or a model Since equipment must be maintained and calibrated while the
review, or a CAD 3D drawing review. Many vendors and users auxiliary system is in operation, it is important to provide
ample personnel space such that equipment can be maintained
have found that models or CAD 3D drawings aid greatly in
understanding and reviewing maintenance accessibility and safely and reliably without damage to surrounding compo-
nents. A rule of thumb is to provide approximately one meter
layout considerations.
of space around components for accessibility. Note that this is
Console construction with the utility lines installed. The review of equipment on
a model, CAD 3D drawing or an outline should be made
Auxiliary equipment consoles or modules house most of the considering installation of all utility lines that will be installed
components that are present in the auxiliary systems. Their
in the field.
construction should be reviewed to ensure proper stiffness and
facilities for installation on site. Many horizontal consoles are
constructed in a flexible manner that can result in bending or Accessibility for on-line testing and calibration
excessive pipe strains introduced into components during Considering that many components (pumps, drivers, coolers,
shipment and at installation. It is suggested that full length filters, control valves, instrumentation) will be tested and cali-
cross members be positioned as a minimum under pumps, brated with equipment still being in operation, accessibility for
coolers and filters on the equipment baseplate (see this operation must be considered.
Figure 7.5.7). If the baseplate is to be grouted in the field, grout In addition to reviewing the vendor manufactured skids, the
and vent holes should be specified and reviewed for placement of all skids in the field must be reviewed for
357