Be st Practice 7 .5           Lube, Seal and Control Oil System Best Practices

                                                                                  Fig 7.5.8   Auxiliary system
                                                                                  component sizing audit form



























































       accessibility. Consideration of the skid arrangement only to be  filter cartridge removal and auxiliary or main driver removal. In
       complicated by installation against a column or wall in the field  addition, consoles are frequently installed in congested areas,
       will not obtain the objectives of total accessibility.  and so lifting arrangements should be reviewed beforehand to
                                                            confirm components can be removed in a safe and easy manner.
                                                              This completes comments concerning the component sizing
       Utility supply arrangement
                                                            audit. All changes made during this meeting should be docu-
       Care should be given to the routing of all utility (conduits, steam  mented and followed up to guarantee that final component
       lines, water lines) supply lines in order to maximize accessibility  design and arrangements are as specified and agreed to in this
       to the critical equipment auxiliary systems.         meeting.


       Considerations for component disassembly             Factory testing and inspection
       All components must be capable of being dissembled quickly,
       easily and safely while the unit is operating in the field. To meet  Having properly specified, designed and manufactured the
       this requirement, sufficient space around the auxiliary console  unit, it remains to confirm proper arrangement and operation.
       must be available for such exercises as cooler bundle removal,  This is accomplished during factory testing and inspection. The