Be st Practice 7 .5 Lube, Seal and Control Oil System Best Practices
Fig 7.5.8 Auxiliary system
component sizing audit form
accessibility. Consideration of the skid arrangement only to be filter cartridge removal and auxiliary or main driver removal. In
complicated by installation against a column or wall in the field addition, consoles are frequently installed in congested areas,
will not obtain the objectives of total accessibility. and so lifting arrangements should be reviewed beforehand to
confirm components can be removed in a safe and easy manner.
This completes comments concerning the component sizing
Utility supply arrangement
audit. All changes made during this meeting should be docu-
Care should be given to the routing of all utility (conduits, steam mented and followed up to guarantee that final component
lines, water lines) supply lines in order to maximize accessibility design and arrangements are as specified and agreed to in this
to the critical equipment auxiliary systems. meeting.
Considerations for component disassembly Factory testing and inspection
All components must be capable of being dissembled quickly,
easily and safely while the unit is operating in the field. To meet Having properly specified, designed and manufactured the
this requirement, sufficient space around the auxiliary console unit, it remains to confirm proper arrangement and operation.
must be available for such exercises as cooler bundle removal, This is accomplished during factory testing and inspection. The