How to Do Lean—The Four Strategies to Becoming Lean         123



                                           Time Stack of Work Elements,  Zeta Cell
                                                  Original                        Original
                         Time in seconds  Activity       Time in seconds  Activity
                                                   Plan                            Plan
                              80
                              79
                              78
                              77                             157
                              76                             156
                              75                             155
                              74       Apply epoxy  Operator 5  154
                              73        14 secs              153
                              72                             152       Package      Operator 10
                              71                             151        12 secs
                              70                             150
                              69                             149
                              68                             148
                              67                             147
                              66                             146
                              65                             145
                              64                             144
                              63     Install O-ring and      143
                              62       clip 8 secs           142
                              61                             141
                              60                             140
                              59                    Operator 4  139
                              58                             138     Final test, wrap
                              57                             137         leads
                              56                             136                    Operator 9
                              55      Install support        135        18 secs
                              54        8 secs               134
                              53                             133
                              52                             132
                              51                             131
                              50                             130
                              49                             129
                              48                             128
                              47                             127
                              46      Insert O-ring,         126
                              45      grease insert,         125
                              44      place in cap.  Operator 3  124
                              43                             123
                              42        13 secs              122
                              41                             121       Apply final
                              40                             120        sealant     Operator 8
                              39                             119        15 secs
                              38                             118
                              37                             117
                              36                             116
                              35     Press in magnets        115
                              34        6 secs               114
                              33                             113
                              32                             112      Unload-load
                              31                             111
                              30                    Operator 2  110  machine 3 secs
                              29       Place in jig,         109
                              28                             108
                              27      glue 6 places          107     Install cover cap  Operator 7
                              26        9 secs               106
                              25                             105        7 secs
                              24                             104
                              23                             103
                              22                             102
                              21                             101
                              20      Install O-ring         100     Install capacitor
                              19        7 secs                99        retainer
                              18                              98
                              17                              97        8 secs
                              16                              96
                              15                              95
                              14                              94
                              13                              93
                              12       Assembly     Operator 1  92    Apply epoxy   Operator 6
                              11                              91        6 secs
                              10        bushing               90
                              9        to bracket,            89
                              8        install cap.           88
                              7                               87
                              6         12 secs               86      Install control
                              5                               85       capacitor
                              4                               84
                              3        Cut Bracket            83        8 secs
                              2                               82
                              1         3 secs                81
                    FIGURE 7-2  Time stack of work elements.
   140   141   142   143   144   145   146   147   148   149   150