144   Machinery  Component Maintenance and Repair

                         Each piping system must be designed with due consideration to these
                       circumstances for the most severe conditions of coincident loading. The
                       following summarizes possible imposed loads that typically need to be
                       considered in a piping design:

                       Design Pressure Loads

                         The pressure at the most severe condition of coincident internal or ex-
                       ternal pressure and temperature expected during normal operation.

                       Weight Loads

                           Dead weight loads including pipe components, insulation, etc.
                           Live weight loads imposed by service or test fluid, snow and ice, etc.

                       Dynamic Loads

                           Design wind loads exerted on exposed piping systems.
                           Earthquake  loads  must  be  considered  for  piping  systems  where
                           earthquake probability is significant.
                           Impact or surge loads typically due to water hammer, letdown, or
                           discharge of fluids  .
                           Excessive  vibrution  arising  from  pressure  pulsations,  resonance
                           caused by  machinery excitations or wind  loads.

                       Thermal ExpansionlContraction Effects
                           Thermal and friction loads due to restraints preventing free thermal
                           expansion.
                           Loading due to severe temperature gradients or difference in expan-
                           sion characteristics.

                       Effects of Support, Anchor, and Terminal Movements
                           Thermal expansion of equipment.
                           Settlement of equipment foundations and/or piping supports.


                          The When, Who, What, and How of Removing Spring Hanger Stops
                                            Associated with Machinery

                       initial Tasks Prior to Machinery Commissioning

                           Align machinery without pipe attached.
                           Adjust pipe for proper fit-up and make connection.