Page 157 - Machinery Component Maintenance
P. 157

140   Machinery  Component Maintenance and Repair

                              2.   AMBIENT   TEMPERATURE  SHALL  BE  AT  LEAST  65'F  DURING
                                   MIXING,  PLACEMENT  AND  CURING  OF  THE  EPOXY  GROUT.
                              3.   MIXING   EQUIPMENT  SHALL  BE  CLEAN  AND  FREE  OF  ALL
                                   FOREIGN  MATERIAL,  SCALE,  MOISTURE  AND  OIL.
                              4.   ALL  PERSONNEL  HANDLING  OR  WORKING  WITH  THE  GROUTING
                                   MATERIALS  SHALL  FOLLOW  SAFETY  INSTRUCTIONS  PRINTED
                                   ON  THE  CAN  LABELS.
                              5.   ONLY  FULL  UNITS  OF  EPOXY  RESIN,   CONVERTER  AND
                                   AGGREGATE  SHALL  BE  USED  IN PREPARING  THE  GROUT.
                              6.   THE  EPOXY  RESIN  (PART  A  -  BLUE  LABEL) AND  THE  CON-
                                   VERTER  (PART  B -  RED  LABEL) SHALL  BE  HAND  BLENDED
                                   FOR  AT  LEAST  THREE  (3)  MINUTES  BUT  NO  MORE  THAN  FIVE
                                   (5) MINUTES  PRIOR  TO  ADDING  THE  AGGREGATE  FILLER,
                              7.   IMMEDIATELY  AFTER  THE  LIQUID  BLENDING  HAS  BEEN
                                   COMPLETED,  THE  AGGREGATE  SHALL  BE  SLOWLY  ADDED  AND
                                   GENTLY  HAND  BLENDED  SO  AS  TO  FULLY  WET  THE  AGGREGATE,
                                   THE  RATE  OF  BLENDING  SHALL  PREVENT  AIR  ENTRAINMENT
                                   IN THE  GROUT  MIXTURE.


                         VII.  PLACEMENT
                               1.   A  SUITABLE  HEAD  BOX  SHALL  BE  PREPARED  TO  HYDRAULICALLY
                                   FORCE  THE  GROUT  INTO  THE  BASEPLATE  CAVITIES.
                              2.   GROUTING   SHALL  BE  CONTINUOUS  UNTIL  THE  PLACEMENT  OF
                                   GROUT  IS COMPLETE  UNDER  ALL  SECTIONS  OR  COMPARTMENTS
                                   OF  THE  BASEPLATE.   IF MORE  THAN  ONE  UNIT  OF  GROUTING
                                   MATERIALS  IS REQUIRED  FOR  A  GIVEN  PIECE  OF  EQUIPMENT.
                                   TWO  MIXING  BOXES  SHALL  BE  EMPLOYED.   SUBSEQUENT
                                   BATCHES  OF  GROUT  SHOULD  BE  PREPARED  SO  AS  TO  BE  READY
                                   WHEN  THE  PRECEDING  BATCH  HAS  BEEN  PLACED.
                              3.   NO  PUSH  RODS  OR  MECHANICAL  VIBRATORS  SHALL  BE  USED
                                   TO  PLACE  THE  GROUT  UNDER  THE  BASEPLATE.
                              4.   ONE  (1)  4"  X  4"  X  4" TEST  CUBE  SHALL  BE  MADE  FROM  EACH
                                   UNIT  OF  GROUT  PLACED.   THE  SAMPLE(S)  SHALL  BE  TAGGED
                                   WITH  THE  EQUIPMENT  NUMBER  ON  WHICH  THE  BATCH  WAS  USED
                                   AND  WHERE  IN THE  FOUNDATION  THE  BATCH  WAS  PLACED.

                         VIII.  FINISHING
                              1.   WHEN  THE  ENTIRE  FORM  HAS  BEEN  FILLED  WITH  GROUT,
                                   EXCESS  MATERIAL  SHALL  BE  REMOVED  AND  THE  EXPOSED
                                   SURFACES  TROWELLED  SMOOTH.   THE  TROWEL  SHALL  BE
                                   WETTED WITH   A  SMALL  AMOUNT  OF  ESCOWELD 9615  CLEAN-UP
                                   SOLVENT.   CARE  SHALL  BE  TAKEN  TO  PREVENT  BLENDING  THE
                                   SOLVENT  INTO  THE  GROUT  SURFACE,
                              2.   ANY  AIR  BUBBLES  RISING  TO  THE  SURFACE  OF  THE  GROUT
                                   SHALL  BE  REMOVED  BY  LIGHTLY  SPRAYING  THE  BUBBLED
                                   SURFACE  WITH  ESCOWELD 9615  CLEAN-UP  SOLVENT  USING
                                   A  HAND  SPRAYER.
                              3.   FORMS SHALL  BE  LEFT  IN PLACE  FOR  TWENTY-FOUR  (24)
                                   HOURS  TO  PERMIT  THE  GROUT  TO  CURE.   THE  SURFACE  OF
                                   THE  GROUT  SHOULD  BE  FIRM  AND  NOT  TACKY  TO  THE  TOUCH.
   152   153   154   155   156   157   158   159   160   161   162