Page 285 - Modern Control of DC-Based Power Systems
P. 285

244                                 Modern Control of DC-Based Power Systems





















          Figure 6.25 ISPS I L15L25L3 for switched LRC, switched CPL—Step 30.9 - 53.4 MW
          load.




          Table 6.9 Load Step 30.9 - 53.4 MW—Switched CPL Representation (t 5 0.25 s)
          Bus Voltage (End Value 5 0.9607 p.u.) RippleB4,5%
                     Overshoot  Undershoot  Settling time  Rise time
                     (%)        (%)         (7.5%)         (step-100%)
          LSF        124.60     88.81       0.0161         0.0036
          Adapt-BS              90.38       0.0028         0.0041
          BS 1 Virt  111.79     84.69       0.0052         0.0037
          LQG 1 Virt 113.56     87.05       0.0052         0.0036
          LQG-Centr 110.44      85.28       0.0061         0.0039
          Synergetic  114.60    88.28       0.0101         0.0034
          Syn 1 Virt  109.50    93.36       0.0060         0.0028
          I&I        114.15     87.15       0.025          0.012
          Hinf       102.15     88.15       0.022          0.015
                     Inductor Current (End Value 5 0.9228 p.u.) RippleB21%
                     Overshoot Undershoot Settling time    Rise time
                       (%)        (%)         (23.5%)        (step-100%)
          LSF        181.73     52.32       0.0136         0.0012
          Adapt-BS   165.69                 0.0062         0.0012
          BS 1 Virt  201.67     73.16       0.0051         0.0014
          LQG 1 Virt 199.72     62.71       0.0044         0.0014
          LQG-Centr 184.33      74.09       0.0061         0.0015
          Synergetic  197.44    44.44       0.0111         0.0013
          Syn 1 Virt  174.47    83.20       0.0037         0.0011
          I&I        158.25                 0.008          0.0018
          Hinf       115.25                 0.008           -
   280   281   282   283   284   285   286   287   288   289   290