Page 305 - Pipeline Risk Management Manual Ideas, Techniques, and Resources
P. 305

13/282 Stations and Surface Facilities
           3.0 pts  [Adequate  Hazard  Analyses]-Semiformal   analyses   3.0 pts [Adequate Lighting System]-System  is effective and
             exists that meet all company and industry minimum recom-   meets  industry and  company  required  or  recommended
             mended or required hazard analysis best practices   lighting system best practices
           8.0 pts  [Inadequate  Hazard  Analyses]-Informal   analyses   8.0 pts [Inadequate Lighting System]-System  is not effective
             exists that do not meet all company and industry minimum   and does not meet industry and company required or recom-
             recommended or required hazard analysis best practices   mended lighting system best practices
           10.0 pts [No Hazard Analyses]-No  known analyses exist and   10.0 pts [No Lighting System]-No  system exists
             few  company  and  industry  minimum  recommended  or   5.0 pts [Unknown Lighting System]
             required hazard analysis best practices are met
           5.0 pts [Unknown Hazard Analyses]          [Protective  Barriers]-  Evaluation  of various  station  third-
                                                      party and vehicle access barriers, including railings, 6-ft chain-
           [Critical Equipment Security]-  Evaluation of  security for   link  fence, barbed  wire,  walls,  ditches, chains, and  locks.
           critical or key facility equipment and systems access, including   Barrier appropriateness, adequacy  for  conditions, strength,
           building locks, locks, keys, chains, protocols, etc.   coverage completeness, and PPM are evaluated.

           0.0 pts [NotApplicable]                    0.0 pts [NotApplicable]
           1  .O pts [Excellent Equipment Security]-All  critical equipment   1  .O pts  [Excellent  Protective  Barriers]-Barriers   are  very
             is well secured, marked, and maintained in a manner exceed-   effective and exceed industry and company required or rec-
             ing industry and company best practices (or is not needed)   ommended best practices (or are not necessary)
           3.0 pts  [Adequate Equipment Security]-All  critical equip-   3.0 pts [Adequate Protective Barriers]-Barriers  are effective
             ment is secured, marked, and maintained to meet industry   and meet industry and company required or recommended
             and company best practices                 best practices
            10.0 pts  [Inadequate Equipment  Security]-Equipment   and   8.0 pts  [Inadequate  Protective  Barriers]-Barriers   are  not
             materials are not well secured, marked, and/or maintained to   effective and do not meet industry and company required or
             meet industry and company best practices   recommended best practices
           5.0 pts [Unknown Equipment Security]        10.0 pts mo Protective Barriers]-No  barriers exist
                                                       5.0 pts [Unknown Protective Barriers]
           Outside force algorithm variables
                                                       Outside force susceptibility
           Site Security Mitigation
                                                       [Severe Weather]-  Evaluation of various hazardous weather
           [Security Detection Systems]-  Evaluation of various station   events, including extreme rainfall, floods, freezing, hail, ice,
           security detection systems and equipment, including gadflame   snow, lightning, and/or winds. The hazardous event potential is
            detectors, motion  detectors,  audio/video  surveillance, etc.   determined by  historical frequency,  severity,  duration, and
            Security system appropriateness, adequacy for service condi-   damage caused.
           tions, coverage completeness, and PPM are evaluated.
                                                       0.0 pts [Not Applicable]
           0.0 pts [NotApplicable]                     2.0 pts [Low Severe Weather Potentiall-Low  potential of one
            1  .O pts [Excellent Security Detection Systems]-Systems  are   or more severe weather events occurring during an average
             very effective and exceed industry and company required or   year with the potential to cause significant facility damage
             recommended security detection systems best practices (or   5.0 pts  [Moderate  Severe  Weather  Potentiall-Moderate
             are not needed)                            potential of one or more severe weather events occurring
            3.0 pts [Adequate Security Detection Systems]-Systems  are   during an average year with the potential to cause significant
             effective and meet industry and company required or recom-   facility damage
             mended security detection systems best practices   10.0 pts [High Severe Weather Potentiall-High  potential of
            8.0 pts [Inadequate Security Detection Systems]-Systems  are   one or  more  severe weather  events  occurring during an
             not effective and do not meet industry and company required   average year with the potential to cause significant facility
             or recommended security detection systems best practices   damage
            10.0 pts [No Security Detection Systems]-No  systems exist   5.0 pts [Unknown Severe Weather Potential]
            5.0 pts [Unknown Security Detection Systems]
                                                       [Ground  Movemen+   Evaluation  of  various  hazardous
            Fighting Systems]-  Evaluation of various  station lighting   ground movement events, including severe earthquakes, erosion,
            systems, including security and perimeter systems and equip-   washouts, expansive soil movement, frost heave, landslide, sub-
            ment  and working areas. System appropriateness, adequacy   sidence or blasting. The hazardous event potential is determined
            for service conditions, coverage completeness, and PPM are   by historical frequency, severity, duration, and damage caused.
            evaluated.
                                                       0.0 pts [NotApplicable]
            0.0 pts [Not Applicable]                   2.0 pts [Low Ground Movement Potentiall-Low  potential of
            1.0 pts [Excellent Lighting System]-System   is very effective   one or more severe ground movement events occurring dur-
             and  exceeds  industry and  company  required  or  recom-   ing an average year with the potential to cause significant
             mended lighting system best practices (or are not needed)   facility damage
   300   301   302   303   304   305   306   307   308   309   310