Page 302 - Pipeline Risk Management Manual Ideas, Techniques, and Resources
P. 302

Modeling ideas Ill 13/279
                10.0 pts [Low Ductility]-Material   is <IO ft-lb   pibration Monitorin+   Monitoring of  in-service equip-
               5.0 pts [Unknown Ductility]                mentimaterial’s frequency, duration, and level and location of
                                                          vibration  stresses  from  various  sources,  including  pumps,
               [Material  Cyclic Stress]-   Evaluation of various in-service   rotating equipment, wind,  throttling valves, surges, tempera-
               material’s frequency, duration, and level and location of cyclic   ture changes, ground movements, traffic, etc.
               stresses, including severe  pump starts/stops, pressure cycles,
               fill cycles, traffic loadings, etc.        0.0 pts mot Applicable]
                                                          2.0 pts [No Vibration Monitoring Needed]-Equipment‘mate-
               0.0 pts [Not Applicable]                     rial is subjected to low or no vibration so does not require
               2.0 pts [Low Cyclic Stress]-Material  is subjected to low cycle   monitoring
                 frequency (number  of  eventdtime),  short  cycle  duration   4.0 pts  [Continuous  Vibration  Monitoring  w/Shutdown]-
                 (time),  low  cycle magnitude  (condition change  amount),   Equipmentimaterial is monitored for  vibration frequency,
                 and/or distant proximity from source (feet)   vibration duration, and vibration magnitude and/or proxim-
               4.0 pts [Moderate Cyclic Stress]-Material  is subjected to mod-   ity from vibration source, which shuts down equipment on
                 erate cycle  frequency, moderate cycle duration, moderate   vibration limit exceedence
                 cycle magnitude and/or moderate proximity from source   6.0 pts  [Continuous  Vibration  Monitoring  w/Alann-
                10.0 pts  [High Cyclic Stress]-Material   is subjected to high   Equipmentimaterial is monitored for  vibration frequency,
                 cycle frequency, long cycle duration, high cycle magnitude,   vibration duration, and vibration magnitude and/or proxim-
                 and/or proximity from source               ity from vibration source which alarms locally/remotely on
               5.0 pts [Unknown Cyclic Stress]              vibration limit exceedence.
                                                          8.0 pts [Manual Vibration Monitoring]-Equipmentimaterial
               [Material  Vibration]-   Evaluation  of  various  in-service   is monitored for vibration frequency, vibration duration, and
               equipmenthaterial’s frequency, duration, level and location of   vibration magnitude and/or proximity from vibration source
               vibration  stresses  from  various  sources,  including  pumps,   manually on a periodic basis (less than one time per year)
               rotating equipment, wind, throttling valves, surges, tempera-   10.0 pts  [No Vibration Monitoring]-Equipmentimaterial   is
               ture changes, ground movements, traffic, etc.   not monitored for vibration
                                                          5.0 pts [Unknown Vibration Monitoring]
               0.0 pts [NotApplicable]
               2.0 pts [Low Vibration Stress]-Material  is subjected to low   [Safety Systems Exceedence Overstress Potentid-  Evaluation
                 vibration frequency (# eventsitime), short vibration duration   of the potential to exceed any level, pressure, temperature, or
                 (time), low vibration magnitude (condition change amount)   flow safe operating limits based on maximum system operat-
                 andor distant proximity from vibration source (feet).   ing  conditions,  equipment  design  limits, and  safety  system
               4.0 pts [Moderate Vibration Stress]-Material  is subjected to   limitations
                 moderate vibration frequency, moderate vibration duration,
                 moderate vibration magnitude and/or moderate proximity   0.0 pts  Po Exceedence  Potential  or  Not  Applicable]-
                 from vibration source.                     Maximum  system  operating  conditions  cannot  exceed
               10.0 pts [Highvibration Stress]-Material  is subjected to high   equipment design or safety system limits
                 vibration frequency, long vibration duration, high vibration   2.0 pts [Low Exceedence Potentiall-Maximum  system oper-
                 magnitude and/or close proximity from vibration source.   ating  conditions  occasionally  exceed  equipment  safety
               5.0 pts [UnknownVibration Stress]            system limits but not design limits
                                                          4.0 pts [Moderate Exceedence Potentiall-Maximum   system
               [Pressure Test Stress]-   Evaluation of pipe, vessel and com-   operating conditions routinely exceed equipment safety sys-
               ponent  pressure test levels by  comparing the minimum test   tem limits but not design limits
               pressure (MTP) and SMYS. Expressed as a percentage: (MTP /   10.0 pts  [High  Exceedence  Potentiall-Maximum   system
               SMYS * 100%).                                operating  conditions  routinely  exceed  equipment  design
                                                            limits and safety system limits
               0.0 pts mot Applicable]                    5.0 pts [Unknown Exceedence Potential]
               2.0 pts [MTP  >loo% SMYSI-High  test pressure level
               5.0 pts [MTP 80% to100Y0 SMYSI-Moderate  test pressure   [Safety Systems Actions]-   Evaluation of the various actions
                 level                                    that initiate, or are initiated by, station safety systems involving
               10.0 pts [MTP 180% SMYSI-Low  test pressure level   changing level, flow, temperature, and pressure conditions.
               5.0 pts [UnknownTest Stress]
                                                          0.0 pts [Not Applicable]
               [Pressure Test Age]-  Evaluation of pipe, vessel, and compo-   2.0 pts   [Automatic   EquipmentiStation   Shutdown-
               nent pressure test ages by  recording the time since the  last   Condition-sensing  device  or  permissive  limit  excee-
               appropriate facility test.                   dences automatically initiate a full, or partial, shutdown of
                                                            affected station equipment, with an alarm to remote/local
               0.0 pts mot Applicable]                      personnel
               2.0 pts [< 5Yrs Old]                       4.0 pts  [Remote  EquipmentiStation Shutdown-Condition-
               10.0 pts [>5 Yrs Old]                        sensing device or permissive limit exceedences alarm at a
               5.0 pts [UnknownTest]                        continuously manned  location  and  requires  operators to