Page 266 - Sustainability in the Process Industry Integration and Optimization
P. 266

E x a m p l e s  a n d Ca s e  S t u d i e s   243


                     10.4.2  Utility Placement: Second Problem

                     Problem 7: Task Assignment
                     A process involves the set of process streams described in Table 10.18.
                     The utilities available to satisfy its heating and cooling requirements
                     are given in Table 10.19.
                        For the HEN to be designed, assume ΔT   = 30°C.
                                                          min
                         (a)  Identify the minimum heating duty, the minimum cooling
                            duty, and the Process Pinch location.
                         (b) Plot the GCC.
                         (c)  Perform an appropriate placement of the utilities against the
                            GCC so as to achieve minimum total cost of the utilities.
                            (1)  Draft the placement on the GCC.
                            (2)  Calculate the total duty for each of the utilities.
                            (3)  Calculate the total utility cost for the problem.
                         (d) Consider the following ways to reduce the utility costs
                            further, and comment on their suitability for application to



                           Stream    T  [°C]  T  [°C]  CP [MW/°C]  ΔH [MW]
                                     s        t
                           H1         175      75        3.5
                           H2        100       40        2.4
                           H3        180      130        1.5
                           H4        195.1    195                   100
                           C1         50      150        2.0
                           C2        140     140.1                  150
                           C3         80      140        1.5
                           C4         20       80        3.0

                          TABLE 10.18  Process Streams Data for Problem 7




                            Name            T  [°C]  T  [°C]  Cost [$/MWy]
                                             s       t
                            HP steam        300.1   300        65000
                            MP steam        200.1   200        50000
                            Cooling water    15.0   20.0        7000
                            Chilled water     5.0   10.0       30000

                           TABLE 10.19  Utilities Available for Problem 7
   261   262   263   264   265   266   267   268   269   270   271