LIME–SODA SOFTENING 7-33

                 The GLUMRB design guidance is less than 4.2 m/h. Therefore, the unit is acceptable for
                 overflow rate.
               b.  Next check the detention time for softening using the volume of the basin.


                                      V      580 m 3
                                  t                      0.078 d or 1.88 h
                                                   3
                                      Q    7,400 m /d
                 The GLUMRB design guidance is one to two hours. Therefore, the unit is acceptable for
                 detention time.
               c.  The unit is next checked for mixing time by calculating the volume of the truncated cone
                 and calculating the detention time in the cone. The volume of a truncated cone is

                                            h
                                              r
                                     V       [( ) 2    (r r  )    ( ) ]r 2  2
                                                     12
                                               1
                                           3
                 where  h       height of the truncated cone

                       r   1       radius at bottom of cone
                       r   2       radius at top of cone
                  For the trial tank the values of  h,   r   1  , and  r   2   are taken from  Table 7-4  .

                                       (3 6 m )    2                    2
                                         .
                                 V            [(6 5 .  )    (6 5 . m )(2 m )    (2 m ) ]
                                         3
                                     223..4 m 3
                  The mixing time in the cone is

                                         223 4 . m 3
                                    t                0030 d or  43 46 min
                                                      .
                                                                 .
                                               3
                                         ,
                                        7 400 m /d
                  The GLUMRB design guidance is a minimum of 30 minutes. Therefore, the unit is ac-
                 ceptable for mixing time.
               d.  The weir length is checked by computing the length of the weir taking into account that
                 there are eight weirs and that water enters both sides of each weir.
                                               ⎛ 12 mdiameter  1 3 . mmdiameter column⎞
                        L   (8 weirs )(2 sides/weir ) ⎜ ⎝        2                 ⎟ ⎠
                             85 6 .  m

                                        3
                 With a flow rate of 7,400 m  /d, the weir hydraulic loading rate is

                                          3
                                   7 400 m /d          3               3
                                    ,
                                                                 .
                                                                    0
                                                  .
                             WL                 86 45 m /dm or  0060 m /min m

                                     85 6 . m