Page 466 - Orlicky's Material Requirements Planning
P. 466

444                                                 PART 4      Looking Backward and Forward


           FIGURE 26-11

           Order spike qualification.
                                          Sales Orders Only
          G


             Order Spikes Qualified
          Y                          Order Spike Threshold
                       X    X
                 X
          R

                    Order Spike Horizon                                   Planning Limit








             Supply against a part will be generated by its available stock position relative to its
        buffer and zone levels. For example, consider four parts (r457, f576, h654, and r672).
        These four parts are assigned to a specific planner (GSC).
             Figure 26-12 shows the difference in relative buffer position between a calculated
        available stock level and actual on-hand. The black arrows indicate the on-hand position,
        and the no-fill arrows represent the available stock position. This type of visibility gives


           FIGURE 26-12
           Available stock                                           Planner: GSC
           versus on-hand
           position.             10,000







                                  5,000










                                               r457       f576       h654      r672
   461   462   463   464   465   466   467   468   469   470   471