286  Practical Power System and Protective Relays Commissioning


                                     t:operation   1
                           Then TM 5           5      5 0:654
                                         T R     1:528
               Relay setting:
               I set 5 1440 A
               5 1.44 A (secondary)
               PSM 5 80  TM 5 0.65
               Operation time at a fault after end B will be:

                                         0:14
                                 t 5 0:65  0:0221  5 0:993s
                                        80
               For an earth fault relay at end A connected to the residual connection of
            CTs at end A:
                              MVA b 3 100     100 3 100
                        %Z S 5            5              5 0:144
                                            80 3 O3 3 500
                                 MVA F
               For a single phase fault at end B we draw the sequence network diagram
            as shown in Fig. 19.2.2.
               PSM calculation:
               I F 5 29.3 KA  I set 5 800 A















            FIGURE 19.2.2 Sequence networks.
                               Z t 5 3Z s 1 2Z 1 1 Z 0
                               5 3 3 0:144 1 2 3 0:3 1 0:15
                               5 0:432 1 0:6 1 0:15 5 1:182%

                                     100:100
                             I 0 5               5 9:769 KA
                                 1:182 3 O3 3 500
                             I F 5 3I 0 5 3 3 9:769 5 29:3KA
                             I set 5 800 A
                                   800
                             I set 5   5 0:8 A secondaryÞ