Page 316 - Practical Power System and Protective Relays Commissioning
P. 316

310  Practical Power System and Protective Relays Commissioning























            FIGURE 19.6.3 Backup impedance protection for generators.
                             Z set 5 0:7 3 0:36 5 0:252- 5 25:2%

                                          25:2 3 417 3 100
                               Z set ΩðÞ  5
                                             100ð220Þ 2
                                                 ð
                                        5 0:217 Ω primaryÞ
                              Z set ΩðÞ secondary  5 5:9 Z primary
                                              5 5:9 3 0:217
                                               5 1:2803 Ω
                                    Z set





                                    Z set 5 0:7 Z Load
                                  Z Load min  5 XG 1 XT
                                           5 Xd} 1 XT
                                           5 0:22 1 o:14
                                              5 0:36
               Set time 5 3 seconds.
               Action:
            1. Turbine tripping;
            2. Tripping of 6.4 K unit transformer incoming;
            3. Generator excitation tripping.
               7. Generator frequency protection
               A. Underfrequency protection
               This protection is required for load-shedding to allow unit frequency
            recovery.
   311   312   313   314   315   316   317   318   319   320   321