                     10.5.2  Water Pinch Technology: Second Problem
                     Problem 9: Task Assignment
                     Using the stream data from Problem 8, suggest a design of a network
                     for maximum reuse of water. The limiting CC is shown in
                     Figure 10.32.
                       Problem 9: Solution
                       Cut off the pockets of the limiting CC. The minimum water requirement for
                       each pocket can then be defined for each region (Figure 10.33). This enables one
                       to propose the design strategy shown in Figure 10.34.
                         Following the design strategy, set up a design grid as shown in Figure 10.35.
                       Connect streams to water mains and merge operations that cross boundaries;
                       see Figure 10.36.
                         Remove intermediate water mains where this is appropriate (Figure 10.37).
                       Then connect operations directly, as shown in Figure 10.38. Finally, Figure 10.39
                       illustrates (in conventional flowsheet form) one of the possible resulting designs
                       of the water system.




                          800




                        C [ppm]  400






                          100

                            0
                              1            9          21            41
                                                  m [kg/h]
                     FIGURE 10.32  Limiting Composite Curve for Problem 9.
   267   268   269   270   271   272   273   274   275   276   277