Page 211 - Petroleum Production Engineering, A Computer-Assisted Approach
P. 211

Guo, Boyun / Computer Assited Petroleum Production Engg 0750682701_chap14 Final Proof page 207  3.1.2007 9:10pm Compositor Name: SJoearun













                      14                                          Other Artificial


                                                                  Lift Methods









                                                               Contents
                                                               14.1  Introduction  14/208
                                                               14.2  Electrical Submersible Pump  14/208
                                                               14.3  Hydraulic Piston Pumping  14/211
                                                               14.4  Progressive Cavity Pumping  14/213
                                                               14.5  Plunger Lift  14/215
                                                               14.6  Hydraulic Jet Pumping  14/220
                                                               Summary  14/222
                                                               References  14/222
                                                               Problems  14/223
   206   207   208   209   210   211   212   213   214   215   216